Skip to content
APEFA

How much does it cost?

Estimate the amounts to plan for in seconds. The rates used are the ones in force today.

150 000 FCFA per hectare
Estimated total
300 000 FCFA
Advance before work starts (2/3)
200 000 FCFA
Balance at handover
100 000 FCFA
Mobilisation deposit (4 × 1 500 FCFA)
6 000 FCFA

Non-binding estimate: only the signed quote is final.

Get a quote
CallWhatsApp